Vermillion DEG reboiler skid

Vermillion DEG reboiler skid

Detailed engineering, fabrication and assembly of 28MT skid. The basis for the design was the P&ID from the client and 3D modelling performed by Array Industries. The skid is designed with an upper and bottom section which can be separately transported due to transportation size limitations.

 

Engineering consisting of:

  • 3D modelling/ piping design
  • Structural design/ Pipe stress analysis
  • Lifting/installation plan

 

Project highlights:

  • Piping design: 150#/ 600# CS/SS
  • Structural design: EN1090/ CS
  • Width: 4000 mm 
  • Length: 9000 mm
  • Height: 7000 mm 
  • Equipment weight: 28 MT

 