Skip to main content

Your Emissions in control

lifting and placement of the flue gas stack

Nouryon - 3-way valve bypass stack

 

Challenge

3 Way valve was blocked and malfuntioning due to excessive corrosion.

Solution

  • Replace existing 3-way valve, partly execution in Alloy59
  • Manufacturing and assembly of electrically operated 3-way valve
  • Onsite replacement & commisioning

Facts

Heat Recovery

Customer:

Nouryon

Location:

Rotterdam, the Netherlands

Benefits

  • Swift replacement due to onsite track record following from recent stack replaceent (Alloy59).
  • Improved corrosion resistance.

Solutions:

Stack

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy statement

 

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy Statement