DOW Silicones - W960 boiler - Suction duct

After doing research on the efficiency of the boiler, the conclusion was made that the potential of the boiler was far from met. To fix this, a redesign of the suction duct had to be made and the current suction duct had to be replaced.

Challenge

  • Creating an efficient intake duct to reach the boiler's potential.
  • The suction channel had to blend into the surrounding components.
  • Create a laminar flow with as little resistance as possible.

Solution

  • CFD study to obtain exact dimensions.
  • Painting the extractor in a desert/sand color.

Facts

Noise control

Customer:

DOW Silicones UK Ltd

Location:

Penarth, United Kingdom

Solutions:

Process ducting

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy statement

 

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy Statement