Skip to main content

Your Emissions in control

Vermillion DEG reboiler skid

 

 

Detailed engineering, fabrication and assembly of 28MT skid. The basis for the design was the P&ID from the client and 3D modelling performed by Array Industries. The skid is designed with an upper and bottom section which can be separately transported due to transportation size limitations.

 

Engineering consisting of:

  • 3D modelling/ piping design
  • Structural design/ Pipe stress analysis
  • Lifting/installation plan

 

Project highlights:

  • Piping design: 150#/ 600# CS/SS
  • Structural design: EN1090/ CS
  • Width: 4000 mm 
  • Length: 9000 mm
  • Height: 7000 mm 
  • Equipment weight: 28 MT

Facts

Pollution control

Customer:

Escher Process Modules BV

Solutions:

Process ducting

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy statement

 

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy Statement