Your Emissions in control

3D drawing of 4 stacks

Almatis B.V. - Replacement of 4 stacks

 

Challenge

  • Oxidation takes place at a fast pace.
  • Replace the stacks without any unacceptable risks.
  • Each stack was supported or stabilized by one of the adjacent stacks.

Solution

  • Bespoke dedicated stack support structure build to and integrated in the existing façade structure, allowing independent support of the stack and ducting.
  • Extra temporarily support of existing stacks for individual removal.
  • Stacks are designed with smaller diameters, carbon steel and a dedicated coating system.

Facts

Heat Recovery

Customer:

Almatis B.V.

Location:

Rotterdam, the Netherlands

Benefits

  • Efficient and safe onsite installation.
  • Risk of downtime was reduced to the minimum.
  • Continuous manufacturing.
  • Internal coating system will contribute to an extended lifetime.

Solutions:

Stack

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy Statement

 

ARRAY

Hoogeveenenweg 93
2913 LV Nieuwerkerk aan den IJssel

Nederland

This email address is being protected from spambots. You need JavaScript enabled to view it.
+31 (0) 10 765 12 00

 

LINKS

Privacy Statement