After requiring more heat than their current boilers could handle, Radboud University had to acquire an additional third boiler. This boiler needed ducting with a stack that was the exact same as the two existing ones.
Challenge
Create an exact copy of the existing ducting system
On-site installation in a challenging surrounding
Solution
On-site visit to measure and document current system
Precise manufacturing of the third ducting stack
Facts
Customer:
Croonwolter & Dros
Location:
Nijmagen, the Netherlands
Benefits
Aesthetically pleasing system
Exhaust gasses are discharged and safely guided to the outside air